Informative Articles: Summary of performance of several digesters:

Facility: AA Dairy

Report Date: 01/06/00

 

By: R. Mattocks

Operation: 1000 Cow Complete Confinement currently operating with 500 cows 8000-10000 gpd manure

Owner: AA Dairy, Inc

 

Contact: Bob Aman

607.659.3200

Location: Candor, NY

 

Utility: NYSEG

Reason for Construction: Odor control and reduce water quality risk.

Construction Completion Date: 1998

Digester design: Mesophilic Plug Flow with plastic liner top 120’ x 30’ 14’

Designer: RCM, Inc

Complete System Cost: $240,000 (40,000 engineering provided by AgSTAR)

Annual O&M: Estimated $15,000/yr

Gas Production: 40,000 CF/day (4000 tons/year CO2 equiv)

Energy Conversion Method: Caterpillar 3306, 130 kW generator

Electrical Energy Produced: 500,000 kWh/yr 60 kW

Thermal Energy Produced:

2500 MMBtu/yr (estimated)

Engine “up-time”: >95%

 

Other products: Sells recovered fiber

Comments:  
Installed as part of the dairy’s plan to reduce environmental impact of the community; installing an irrigation line to reduce truck traffic.  Recipient of the Governor’s Environmental Award 1999 (Press release available).

 

Facility: Haubenschild Dairy

Report Date: 01/06/00

 

By: R. Mattocks

Operation: 1000 Cow Complete Confinement currently operating with 500 cows 8000-10000 gpd manure.

Owner: Haubenschild Farms, Inc

 

 

Contact:

Dennis Haubenschild

612.389.2867

Location: Princeton, MN

 

Utility: East Central Electric-selling 90% of production.

Reason for Construction: Odor control, reduce water quality risk, energy recovery and utilization.

Construction Completion Date: 1999

Digester design: Mesophilic Plug Flow with plastic liner top 130’ x 30’ x 14’

Designer: RCM, Inc

Complete System Cost: $250,000        ($40,000 engineering supplied by AgSTAR)

Annual O&M: Estimated $7,500/yr

Gas Production: 40,000 CF/day (4000 tons/year CO2 equiv).

Energy Conversion Method:

Caterpillar 3406, 130 kW generator

Electrical Energy Produced:

500,000 kWh/yr (annualized) 65-70 kW

Thermal Energy Produced:

2500 MMBtu/yr (estimated)

Engine “up-time”: >95%

Other products: None

Comments:

Recovered hot water used for floor heating in the parlor area, and will be used to heat alleyways in the new barn (under construction).

Very happy with facility.

Very frequent visitors.

 

   

Facility: Swine USA

Report Date:  01/06/00

 

By: R. Mattocks

Operation: 5600 Sow Farrow to Wean 22,000 gpd manure.

 

Owner: Crestland Coop.

Contact: Gary Weeda

515.782.3079

Location: Thayer, IA

 

Utility: Clark Electric Coop.

Reason for Construction: Odor control

Construction Completion Date: 1999

Digester design: Intermittent mix, mesophilic

80’ x 60’ x 14’

Designer: RCM,Inc.

Complete System Cost: $550,000

 

Annual O&M: $9000 (estimated)

Gas Production: 30,000 CF/day (3000 tons/yr CO2 equiv).

Energy Conversion Method:

Caterpillar 3306 with a 80kW generator

Electrical Energy Produced: 70-80 kW 600,000 kWh/yr (annualized).

Thermal Energy Produced:

3300 MMBtu/yr (est)

Engine “up-time”: >90%

Other products: None

Comments:

 

 

Facility: Colorado Pork

Report Date:  01/06/00

 

By: R. Mattocks

Operation: 5600 Sow Farrow to Wean 15000-18000 gpd manure.

Owner: Gary Swanson

Contact No:

719.336.5882

Location: Lamar, Colorado

Utility: Southeast Colorado Power

Reason for Construction: Odor control

Construction Completion Date: 1999

Digester design: Intermittent mix, mesophilic

Designer: RCM,Inc.

Complete System Cost: $250,000     ($40,000 engineering provided by AgSTAR).

Annual O&M:

$6000 (estimated)

Gas Production: 30,000 CF/day  (3000 tons/yr CO2 equiv).

Energy Conversion Method:

Caterpillar 3306 with a 80kW generator

Electrical Energy Produced:

400,000 kWh/yr (annualized) 50-60 kW.

Thermal Energy Produced:

2200 MMBtu/yr (est)

Engine “up-time”: >90%

Other products: None

Comments:

Part of a health department study.
 

Important Offer:
Is a Digester Suitable for your Facility? Click here for a Free Evaluation.

Return to TOP of PAGE  -  HOME  -  Table of Contents: Informative Articles

 

Richard Mattocks, ENVIRONOMICS LLC
http://waste2profits.com | rpm@waste2profits.com
2517 Rte. 44, 11-221, Salt Point, NY 12578
Tel: 845.635.4206 | Fax: 845.635.4169
Have a question? Email is always the best and fastest way to reach us.

Webmaster & Creator: L. T. GOODLIFE PUBLISHING COMPANY, INC.
Providing affordable Web Hosting, Design & Publishing; Marketing & Advertising. "Turn your writing into a business"
Phone: 1.800.497.6599 · e-mail: webmaster@LTGOODLIFE.COM

© Copyright ENVIRONOMICS  all rights reserved